Search returned 69 results

No Results Found.

Scrap Tire Solid Waste Acceptance Facility

Solid Waste Program

A Solid Waste Acceptance Facility Approval is to authorize the processing of scrap tires at any permitted landfill, incinerator, transfer station, or processing facility.

Details →
9  Months
$0

Septics System Construction Permit

Wastewater Permits Program - Wells and Septic Division

Any individual or property owner who desires to have a sewage disposal (septic) system installed on their property or requiring repair to an existing system must get a Septic System Construction Permit.

Details →
120  Days
$150 - $500

Sewage Sludge Utilization Permit

Solid Waste Program

The application of sewage sludge to land returns essential nutrients to the soil, adds organic matter, and can improve the tillabilty and moisture retention capability of the soil. A sewage sludge utilization permit is required by the Maryland Department of Environment for any person who treats, composts, transports, stores, distributes, applies to land, incinerates, conducts innovative or research projects or disposes of sewage sludge or septage (effluent from septic tanks) in Maryland. Sewage sludge (also known as biosolids) is not sewage. It is one of the final products of the treatment of sewage at a wastewater treatment plant. After treatment to break down the organic matter and destroy disease causing organisms, the remaining fine particles ultimately become sewage sludge.

Details →
36  Months
$25 to $750

Small Pond Approval

Stormwater, Dam Safety, and Flood Management Program

Permit to construct, reconstruct, modify, repair, or remove a dam

Details →
3 -12  Months
$0